top of page

BIA Route 7

In Rosebud, SD, Loiseau Construction is completing Phase 1 of a 2 Phase project. Phase 1 includes the total regrade of BIA Route 7. This is a large project that consists of pipe replacement, asphalt surfacing, and major grading.

bottom of page